New sectors · Active
Sector 95
Often the alternate when Sector 91 feels tight. Low headline value, which means the specific facing and the park matter more than the sector sticker.
- A numbered sector outside the original Phase 1–11 grid.
- Rates move by facing, size and paper. A sector average will mislead you.
- We would rather show you two real options than a brochure of twelve.
Ask the desk: Plot, floor or flat — and the budget you will actually transfer.
Desk notes
No standalone note yet. The enquiry still reaches the same desk.